Pre Commissioning and Commissioning Service

Excellent Projects has successfully completed various Pre commissioning and Commissioning activities for refineries, petrochemical and oil and gas industries. Pre-commissioning work commences once the construction phase is largely completed. Our highly skilled crew has the experience and expertise to offer reduced time, cost and project risk, and greater efficiency.

 

Our team provide assistance in

  • Flushing of pipelines
  • Dewatering
  • Nitrogen preservation of equipment
  • Checking integrity and continuity of system
  • Assistance in functional checks of equipment
  • Hydro-testing of equipment and pipelines
  • On field modifications to isometric designs
  • Pigging assistance
  • Scaffolding
  • Painting
  • Wrapping /Coating of pipelines
  • Attending leakages

 

Successful plant commission has three basic aspects:

 

No Loss Time Accidents:

 

No commissioning can be considered a success if it is not done safely. Safety should be made priority from the very beginning of the design and construction phase till and commissioning of plants.

 

No Equipment Damage

 

This is the again one of the most important aspect during pre-commissioning/commissioning stage, where caution is taken to avoid any damage to the equipment while shifting, aligning, installation etc. and its appropriate preservation if required.

 

Plant Handover

 

Our engineers provide complete assistance to your team till your plant is up and running without leakages.